Reports & Applications
Transmission Line Pole Sealing Program
- Technical Memorandum – Risk Assessment Analysis – June 20, 2014 [0.2 MB]
- MOE Memorandum – Pole Foundations – June 26, 2014 [0.4 MB]
- Technical Memorandum – Pole Foundations – July 4, 2014 [0.2 MB]
- Technical Memorandum – Pole Foundations – July 21, 2014 [3.1 MB]
- Technical Memorandum – Pole Foundations – Sept 11, 2014 [0.06 MB]
- Technical Memorandum – Pole Foundations – Oct 20, 2014 [0.08 MB]
- Technical Memorandum – Pole Foundations – Oct 29, 2014 [0.1 MB]
Emission Turbine Acoustic Reports
- Turbine T27 (T4.10) ACOUSTIC REPORT – August 2, 2018 [10.6 MB]
- Turbine T37 (T1.04) ACOUSTIC REPORT – July 18, 2018 [7.53 MB]
- Turbine T44 (T1.08) ACOUSTIC REPORT – March 15, 2017 [8.81 MB]
- Turbine T47 (T1.10) ACOUSTIC REPORT – April 13, 2017 [4.93 MB]
- Turbine T24 (T2.09) ACOUSTIC REPORT – November 14, 2017 [9.61 MB]
- Turbine T26 (T4.05) ACOUSTIC REPORT – November 14, 2017 [6 MB]
- Turbine T36 (T4.09) ACOUSTIC REPORT – May 30, 2017 [11.4 MB]
Ontario Power Authority Notice to Proceed
Final Renewable Energy Approval Reports
Administrative Amendment – May 11, 2018
EBR Posting – September 21, 2018
- View Notice of REA Amendment [1 MB]
- View DWP Modifications Document [13 MB]
- View Notice of REA Amendment [0.8 MB]
- View DWP Modifications Document [6.4 MB]
REA Amendment – October 9, 2014
- Amendment to Renewable Energy Approval [0.02 MB]
Environmental Management and Spills Prevention & Control Plan | 230 kV Transmission Line
Environmental Management & Spills Prevention & Control Plan | Main Project Area
Renewable Energy Approval – No. 5460-98BPH8 – June 10, 2013
Environmental Review Tribunal – DECISION
Final Application for Approval of a Renewable Energy Project
Changes Report #2 – May 30, 2013
Changes Report #2 – Appendix D – Noise Study Report
Changes Report – March 6, 2013
- View Clarification Report (Full Version) [46.3 MB]
View Clarification Report by Chapter- Chapter 1 – Introduction [0.5 MB]
- Appendix A – Final Plan Maps [3.42 MB]
- Appendix B – MNR and MTCS Reconfirmation Letters [5.80 MB]
- Appendix C – Heritage Reports [1.95 MB]
- Appendix D – First Nations Consultation [0.35 MB]
- Appendix E – Niagara Escarpment Consultation [9.22 MB]
- Appendix F – Shelburne Municipal Consultation Form [0.19 MB]
- Appendix G – Summary of Text Changes [0.05 MB]
- Appendix H – Public Consultation [11.3 MB]
- Appendix I – Municipal Consultation (Part 1) [5.73 MB]
- Appendix I – Municipal Consultation (Part 2) [11.1 MB]
- Appendix J – Noise Study [5.0 MB]
Final Construction Plan Report
- View Final Construction Plan Report (Full Version) [100.7 MB]
View Final Construction Plan Report by Chapter- Chapter 1 – Introduction [0.35 MB]
- Chapter 2 – Project Proponent [0.22 MB]
- Chapter 3 – Project Location [2.2 MB]
- Chapter 4 – Description of Construction and Installation activities [2.0 MB]
- Chapter 5 – Description of Negative Environmental Effects and Mitigation Measures [1.8 MB]
- Chapter 6 – Conclusions [0.38 MB]
- Appendix A (Part 1) [0.54 MB]
- Appendix A (Part 2) [8.2 MB]
- Appendix A (Part 3) [5.9 MB]
- Appendix A (Part 4) [7.2 MB]
- Appendix A (Part 5) [7.0 MB]
- Appendix A (Part 6) [10.1 MB]
- Appendix A (Part 7) [12.1 MB]
- Appendix A (Part 8) [8.5 MB]
- Appendix A (Part 9) [9.9 MB]
- Appendix A (Part 10) [7.4 MB]
- Appendix A (Part 11) [11.2 MB]
- Appendix A (Part 12) [9.6 MB]
- Appendix B (Part 1) [12.2 MB]
- Appendix B (Part 2) [7.7 MB]
- Appendix B (Part 3) [10.2 MB]
- Appendix C (Part 1) [6.0 MB]
- Appendix C (Part 2) [3.0 MB]
- Appendix C (Part 3) [10.5 MB]
- Appendix C (Part 4) [10.4 MB]
- Appendix C (Part 5) [11.7 MB]
- Appendix C (Part 6) [10.3 MB]
- Appendix C (Part 7) [10.0 MB]
- Appendix C (Part 8) [8.9 MB]
- Appendix D [0.99 MB]
Final Project Description Report
- The Project Description Report provides an overview of the Project and summarizes important information from the complete draft REA reports.
- View Final Project Description Report (Full Version) [5.89 MB]
Final Design and Operations Report (includes Noise Study Report)
- View Final Design and Operations Report (Full Version) [40.5 MB]
View Final Design and Operations Report by Chapter- Chapter 1 – Introduction [0.10 MB]
- Chapter 2 – Proponent [0.06 MB]
- Chapter 3 – Project Summary [2.2 MB]
- Chapter 4 – Site Plan [1.2 MB]
- Chapter 5 – Facility Design Plan [0.24 MB]
- Chapter 6 – Facility Operations Plan [0.12 MB]
- Chapter 7 – Description of Negative Environmental Effects and Mitigation [0.10 MB]
- Chapter 8 – Environmental Effects Monitoring Plan [0.13 MB]
- Chapter 9 – Emergency Response and Communications Plan1 [0.13 MB]
- Chapter 10 – Consideration For Projects Subject to Land Use Plans [0.05 MB]
- Chapter 11 – Summary and Conclusions [0.04 MB]
- Appendix A – Property Level Site Plans (Part 1) [11.7 MB]
- Appendix A – Property Level Site Plans (Part 2) [10.4 MB]
- Appendix A – Property Level Site Plans (Part 3) [11.5 MB]
- Appendix B – UTM Coordinates for Wind Turbine and Receptors [0.20 MB]
- Appendix C – Noise Study Report [5.5 MB]
- Appendix D – Photo Simulations of Power Lines [1.3 MB]
- Appendix E – Conceptual Drawings of Project Components [3.7 MB]
- Appendix F – Manufacturer Maintenance Checklist [5.7 MB]
- Appendix G – Microwave Impact Analysis [1.4 MB]
- Appendix H – NAV Canada Acceptance Letter [0.34 MB]
Final Property Line Setback Report
- View Final Property Line Setback Report (Full Version) [11.0 MB]
View Final Property Line Setback Report by Chapter- Chapter 1 – Introduction [0.35 MB]
- Chapter 2 – Project Proponent [0.27 MB]
- Chapter 3 – Project Location [0.33 MB]
- Chapter 4 – Property Line Setback Report Requirements [0.86 MB]
- Chapter 5 – Property Line Assessment [0.35 MB]
- Chapter 6 – Site Plans [8.8 MB]
- View Final Water Assessment Report (Full Version) [46.3 MB]
View Final Water Assessment Report by Chapter- Chapter 1 – Introduction [0.38 MB]
- Chapter 2 – Project Proponent [0.38 MB]
- Chapter 3 – Project Location [2.4 MB]
- Chapter 4 – Records Review Purpose [0.36 MB]
- Chapter 5 – Records Review Results [2.5 MB]
- Chapter 6 – Site Investigation Purpose [0.34 MB]
- Chapter 7 – Site Investigation Methodology [2.3 MB]
- Chapter 8 – Site Investigation Results [2.3 MB]
- Chapter 9 – Summary of ammendments to the records review [0.33 MB]
- Chapter 10 – Conclusions [3.5 MB]
- Chapter 11 – References [0.34 MB]
- Appendix A – Supplementary Information [2.1 MB]
- Appendix B – GIS Data [0.86 MB]
- Appendix C – Site Photos [2.7 MB]
- Appendix D – Field_Notes [4.8 MB]
- View Final Water Body Report (Full Version) [14.7 MB]
View Final Water Body Report by Chapter- Chapter 1 – Introduction [0.04 MB]
- Chapter 2 – Proponent [0.06 MB]
- Chapter 3 – Location [0.56 MB]
- Chapter 4 – Project Summary [6.2 MB]
- Chapter 5 – Environmental Impact Study Purpose [0.04 MB]
- Chapter 6 – Rationale for Development within a Water Body or Setback [0.05 MB]
- Chapter 7 – Access to Adjacent Lands [0.03 MB]
- Chapter 8 – Project Activities [0.31 MB]
- Chapter 9 – Existing Environmental Conditions of Relevant Water Bodies [0.06 MB]
- Chapter 10 – Environmental Effects of the Project [0.03 MB]
- Chapter 11 – Environmental Effects Monitoring Plan [0.03 MB]
- Chapter 12 – Negative Environmental Effects Desing and Operations [0.12 MB]
- Chapter 13 – Negative Environmental Effects Construction [0.03 MB]
- Chapter 14 – Additional Approval and Permitting Requirements [0.03 MB]
- Chapter 15 – Conclusions [0.03 MB]
- Chapter 16 – References [0.02 MB]
- Appendix A – DFP Operational Statements [0.69 MB]
- View Final Records Review (Full Version) [22.5 MB]
View Final Records Review by Chapter- Chapter 1 – Introduction [0.17 MB]
- Chapter 2 – Project Proponent [0.02 MB]
- Chapter 3 – Project Location [2.1 MB]
- Chapter 4 – Records Review Purpose [0.15 MB]
- Chapter 5 – Records Review Methodology [0.13 MB]
- Chapter 6 – Records Review Results [4.8 MB]
- Chapter 7 – Conclusions [0.23 MB]
- Chapter 8 – References [0.13 MB]
- Appendix A – Supplementary Information [6.7 MB]
- Appendix B – GIS Data Layer Information [0.1 MB]
- Appendix C – Species List [0.57 MB]
Final Evaluation of Significance
- View Final Evaluation of Significance (Full Version) [117.9 MB]
View Final Evaluation of Significance by Chapter- Chapter 1 – Introduction [0.17 MB]
- Chapter 2 – Project Proponent [0.02 MB]
- Chapter 3 – Project Location [2.1 MB]
- Chapter 4 – Summary of Site Investigation [4.3 MB]
- Chapter 5 – Evaluation of Significance Purpose [0.17 MB]
- Chapter 6 – Evaluation of Significance Methodology (Part 1) [4.5 MB]
- Chapter 6 – Evaluation of Significance Methodology (Part 2) [9.4 MB]
- Chapter 6 – Evaluation of Significance Methodology (Part 3) [8.7 MB]
- Appendix A – Supplementary Information [4.1 MB]
- Appendix B – Field Notes [0.1 MB]
- Appendix C – Site Photographs [10.6 MB]
- Appendix D – Species [0.54 MB]
- Appendix E – ELC Communities [0.17 MB]
- Appendix F – Wetland Characteristics and Ecological Assessment (Part 1) [11.0 MB]
- Appendix F – Wetland Characteristics and Ecological Assessment (Part 2) [11.5 MB]
- Appendix F – Wetland Characteristics and Ecological Assessment (Part 3) [11.2 MB]
- Appendix F – Wetland Characteristics and Ecological Assessment (Part 4) [10.6 MB]
- Appendix F – Wetland Characteristics and Ecological Assessment (Part 5) [11.1 MB]
Final Site Investigation Report
- View Final Site Report Investigation (Full Version) [110.7 MB]
View Final Site Investigation Report by Chapter- Chapter 1 – Introduction [1.17 MB]
- Chapter 2 – Project Proponent [0.16 MB]
- Chapter 3 – Project_Location [7.7 MB]
- Chapter 4 – Results of Records Review [5.5 MB]
- Chapter 5 – Site Investigation Purpose [0.17 MB]
- Chapter 6 – Site Investigation Methodology [0.36 MB]
- Chapter 7 – Site_Investigation_Results (Part 1) [6.1 MB]
- Chapter 7 – Site_Investigation_Results (Part 2) [11.8 MB]
- Chapter 7 – Site_Investigation_Results (Part 3) [9.5 MB]
- Chapter 8 – Summary of Ammendments Records Review [0.23 MB]
- Chapter 9 – Conclusions [0.28 MB]
- Chapter 10 – References [0.16 MB]
- Appendix A – Supplementary Information [9.0 MB]
- Appendix B – Field Notes (Part 1) [11.7 MB]
- Appendix B – Field Notes (Part 2) [7.9 MB]
- Appendix B – Field Notes (Part 3) [6.4 MB]
- Appendix B – Field Notes (Part 4) [6.1 MB]
- Appendix C – Site Photographs [10.6 MB]
- Appendix D – Species [0.7 MB]
Natural Heritage Assessment Addendums
- View Natural Heritage Assessment Addendum #1 (Full Version) [4.64 MB]
- Ministry of Natural Resources Confirmation [0.03 MB]
View Natural Heritage Assessment Addendum #2 & #3 (Full Version) [16.9 MB]
View Natural Heritage Assessment Addendum #2 & #3 in Parts- Part 1 [8.6 MB]
- Part 2 [8.14 MB]
- Ministry of Natural Resources Confirmation #2 & #3 [0.01 MB]
View Natural Heritage Assessment Addendum #4 [47.5 MB]
View Natural Heritage Assessment Addendum #4 in Parts- Part 1 [12.2 MB]
- Part 2 [11.8 MB]
- Part 3 [11.8 MB]
- Part 4 [11.5 MB]
- Ministry of Natural Resources Confirmation #4 [0.3 MB]
View Natural Heritage Assessment Addendum #5 (Full Version) [6.09 MB]- Ministry of Natural Resources Confirmation #5 [0.09 MB]
View Natural Heritage Assessment Addendum #6 (Full Version) [11 MB]- Ministry of Natural Resources Confirmation #6 [0.02 MB]
View Natural Heritage Assessment Addendum #7- Part 1 – Addendum [0.05 MB]
- Part 2 – Compiled Figures [11.5 MB]
- Ministry of Natural Resources Confirmation #7 [0.3 MB]
Final Environmental Impact Statement
- View Final Environmental Impact Statement (Full Version) [31.1 MB]
View Final Environmental Impact Statement by Chapter- Chapter 1 – Introduction [0.05 MB]
- Chapter 2 – Proponent [0.03 MB]
- Chapter 3 – Project Location [3.6 MB]
- Chapter 4 – Project Summary (Part 1) [4.2 MB]
- Chapter 4 – Project Summary (Part 2) [11.4 MB]
- Chapter 4 – Project Summary (Part 3) [9.0 MB]
- Chapter 5 – Environmental Impact Study Purpose [0.29 MB]
- Chapter 6 – Rationale for Development within a Natural Feature or Setback [0.20 MB]
- Chapter 7 – Project Activities [0.13 MB]
- Chapter 8 – Existing Environmental Conditions and Relevant Natural Features [0.40 MB]
- Chapter 9 – Environmental Effects of the Project [0.52 MB]
- Chapter 10 – Environmental Effects of the Project [0.05 MB]
- Chapter 11 – Negative Environmental Effects Design and Operations [0.03 MB]
- Chapter 12 – Negative Environmental Effects Construction [0.03 MB]
- Chapter 13 – Conclusions [0.03 MB]
- Chapter 14 – References [0.02 MB]
- Appendix A – Alternative Option Package [0.33 MB]
- View Consultation Report (Full Version) [174 MB]
View Consultation Report by Chapter- Chapter 1 – Introduction [0.06 MB]
- Chapter 2 – Project Proponent [0.05 MB]
- Chapter 3 – Municipal Consultation [0.39 MB]
- Chapter 4 – Stakeholder Consultation [0.21 MB]
- Chapter 5 – Aboriginal Consultation [0.06 MB]
- Chapter 6 – Agency Consultation [0.07 MB]
- Chapter 7 – Media [0.06 MB]
- Chapter 8 – Communication Tower Consultation [0.06 MB]
- Chapter 9 – Navigation NAV Canada [0.05 MB]
- Chapter 10 – Release of Draft and Final REA Documents [0.05 MB]
- Chapter 11 – Future Consultation Commitments [0.06 MB]
- Appendix A – Project Notification [3.22 MB]
- Appendix B – PIC Information (Part 1) [5.21 MB]
- Appendix B – PIC Information (Part 2) [4.98 MB]
- Appendix B – PIC Information (Part 3) [8.49 MB]
- Appendix B – PIC Information (Part 4) [6.91 MB]
- Appendix C – Aboriginal Consultation (Part 1) [6.78 MB]
- Appendix C – Aboriginal Consultation (Part 2) [14.1 MB]
- Appendix D – Municipal Consultation (Part 1) [9.21 MB]
- Appendix D – Municipal Consultation (Part 2) [7.56 MB]
- Appendix D – Municipal Consultation (Part 3) [16.6 MB]
- Appendix E – Public Consultation (Part 1) [6.3 MB]
- Appendix E – Public Consultation (Part 2) [5.68 MB]
- Appendix E – Public Consultation (Part 3) [23.1 MB]
- Appendix F – Support Letters [32.8 MB]
- Appendix G – Agencies (Part 1) [5.57 MB]
- Appendix G – Agencies (Part 2) [2.83 MB]
- Appendix G – Agencies (Part 3) [5.72 MB]
- Appendix G – Agencies (Part 4) [6.32 MB]
- Appendix G – Agencies (Part 5) [7.57 MB]
- Appendix H [2.60 MB]
Ontario Energy Board
Ontario Energy Board Leave to Construct
- OEB Notice of Application and Hearing [0.3 MB]
- OEB Leave to Construct Application Summary [0.06 MB]
- OEB Leave to Construct Application (Full Version) [20.23 MB]
Other Reports
- FPTR PC [0.04 MB]
- International EMF Project [0.06 MB]
- Health Canada [0.4 MB]
- Kinectrics EMF Study for 230kV Underground Power Line [0.5 MB]
- The Railroad Clearance report reviews the construction effects of a 230kV transmission line on railway clearance requirements along the former Toronto Grey and Bruce rail corridor.
View Railroad Clearance Report [1 MB]- View RR Clearance Report Drawings – A [3 MB]
- View RR Clearance Report Drawings – B [3 MB]
- View RR Clearance Report Drawings – C [3 MB]